UGUIDE
Active member
Done with field 1, 20 acres, 5 hours. Slow going.
The system worked very well and moved wildlife out in front of equipment. Flushed all in the contest. Forgot to include fawns and rabbits of which 2 fawns were flushed and 4 rabbits.
The cover is heavy. many weeds chest height 5'. Clipping at county spec of 10" and looks good and there is some good grass coming which is anywhers from 10-16".
Here's what it looks like in action. Getting video and battery 1 did not last long but battery 2 is doing better. Should get 9 hours on a battery.

Back to it after dropping battery 1 in charger and picking up some cold pizza.
The system worked very well and moved wildlife out in front of equipment. Flushed all in the contest. Forgot to include fawns and rabbits of which 2 fawns were flushed and 4 rabbits.
The cover is heavy. many weeds chest height 5'. Clipping at county spec of 10" and looks good and there is some good grass coming which is anywhers from 10-16".
Here's what it looks like in action. Getting video and battery 1 did not last long but battery 2 is doing better. Should get 9 hours on a battery.

Back to it after dropping battery 1 in charger and picking up some cold pizza.